Customer Request
The product material is PEEK, which is expensive. We need to pay attention to the efficiency of material use and reduce the generation of waste through reasonable mold structure design. Specific production process to produce qualified products.
Solution
Given the high cost of PEEK, controlling the weight of the runner and sprue was crucial to managing production costs. The design of the gate and runner system directly impacts sprue weight, which in turn affects overall cost efficiency. By utilizing advanced molding simulation analysis, we optimized the flow balance to achieve minimal sprue weight,significantly reducing injection molding costs and enhancing the product’s competitiveness.
Result Feedback
Trail mold T0 can reach mass production status and transfer to customer production.
Application Scenario:Implantation Consumables